Press Releases
Factual Investigation Report handed to NSW Police
BOC is extremely saddened by the tragic death of a newborn and the injury of
another at Bankstown-Lidcombe Hospital over the past weeks.
BOC has completed a Factual Investigation Report into the July 2015
installation project at Bankstown-Lidcombe Hospital and this has been
provided to the NSW Police.
It was found during an
inspection by Police, Hospital staff and BOC that both the medical oxygen
and medical nitrous oxide pipelines were incorrectly labelled prior to BOC’s
work being undertaken at the Hospital in July 2015. The original
installation of pipes was not conducted by BOC.
The July
2015 project documentation indicates that both a hospital representative and
a BOC contractor were involved in the commissioning of the single oxygen
outlet where the fault was found. This is the focus of ongoing NSW Police
and Coroner investigations.
Pending the outcome of these
investigations, no projects or work has been allocated to the contractor
involved in the commissioning of the oxygen outlet at Bankstown-Lidcombe
hospital.
Regardless of the outcome of any investigations,
BOC will be increasing the level of testing in every new medical gas
pipeline installation above and beyond the requirements of the Australian
Standard.